(2021 Jangsu Travel) Nanjing Tianshi New Materials Technology Co., Ltd.

Packaging Machinery (78)

Address: No. 29, Cao Fang Road, Liuhe Economic Development Zone, Nanjing, Jiangsu Province

Quantity: 8

Application: matching reactor, experimental research

Scheme:
1. AH120KW is a 4-ton reactor with 2 tons of material + 2 tons of water. It takes more than 4 hours for the temperature to rise to 302℉.
2. AH72KW + 6KW superheater (design temperature 572℉), equipped with 2 tons of reactor, 1 ton of material, 1 ton of water, temperature of 311℉, 3 and a half hours.
3. One of the 2.5MPA 72KW is equipped with a 1-ton reactor, 500 kilograms of materials, 500 kilograms of water, a temperature of about 284℉, more than 3 hours.
4. 72KW + 18KW superheater, equipped with 500-liter, 200-liter, 50-liter reactor, can reach about 302℉ in an hour and a half. This is mainly the role of experiments. If feasible, the rotary kettle will be mass-produced in large quantities, that is, 2 tons and 4 tons of reactors above.
5. Another 2.5MPA 72KW leads into the sandwich pipe to melt wax. The inner diameter of the pipe is 1 inch, the outer diameter is unknown, and the length is more than 40 meters. The temperature needs to reach about 302℉, and this temperature can be reached in more than 2 hours.
6. 1314KW-18KW is mainly used for experimental research, and the main process is unknown.

Customer feedback: Our equipment is well used, can meet the customer’s production requirements, and is more convenient to use. We have purchased a number of them before and after.

Resolutions:
1.Remind the customer to tighten the coil regularly to avoid short circuit;
2.Remind customers that pressure gauges and safety valves are calibrated once a year;
3.A heating pipe in the 72KW + 18KW overheating all-in-one machine needs to be prepared;
Master maintenance, the equipment runs normally, and remind customers to do a good job in daily maintenance.

(2019 Jangsu Travel)Nanjing Xiyuan Biomedical Technology Co., Ltd.

Packaging Machinery (79)

Address: Tangshan Cuigu Agricultural Demonstration Park, Shangfeng Community, Tangshan Street, Jiangning District, Nanjing City, Jiangsu Province

Machine model: AH72KW/AH108KW

Quantity: 2

Uses: matching air injection buffer tank, evaporation tank, extraction tank, and heating water.

Scheme: Customers are engaged in the research and development of biomedical products and health food, specializing in the research and development of new traditional Chinese medicine and health food, mainly Fenglingsen brand ginseng capsules, etc., so our equipment is equipped with their laboratory. Only after the experiment is successful, it is mass production.

1) The equipment of AH72KW is mainly equipped with 0.2 cubic meters of air injection buffer tanks, evaporation tanks and extraction tanks. The volume is unknown (the customer does not know how big it is). They can open these equipment at the same time and reach 4 pressures in more than ten minutes. The specific process has not been disclosed too much, because it is an experimental project;

2) AH108KW is mainly used to boil hot water. It takes about an hour for 1 ton of water to boil to 176℉.

Packaging Machinery (80)

Customer feedback:

The gas production is very fast and the steam is sufficient. However, I hope that our device can be upgraded in the later stage. The customer has made improvements on AH108KW and connected to the mobile phone to control the start and stop of our device, which will be more convenient to operate.

Customer feedback:

The gas production is very fast and the steam is sufficient. However, They hope that our device can be upgraded in the later stage. The customer has made improvements on AH108KW and connected to the mobile phone to control the start and stop of our device, which will be more convenient to operate.

Packaging Machinery (81)

Solve the problem:

1. The floating ball of the AH72KW water tank can’t turn off the water, and the master will return to normal use after repair;

2. The AH108KW equipment heating pipe coil has burned out, and the master reminds you to tighten the coil regularly;

3. The operator knows the equipment very well and discharges sewage with pressure every day;

4. Train customers to operate the equipment correctly, as well as daily maintenance.